Gallery
![]() |
This 250 Gallon Tank needed replacement, not only was it an eye sore but it was no longer compliant with the new planning & safety requirements. This meant that the Tank could no longer remain in the same location. |
![]() |
After consultation with the customer a new location for the tank was chosen. The condition of the ground meant that a reinforced concrete slab was required to ensure a firm platform to place the tank on. |
![]() |
The customer required a similar size tank as the older metal one. As there was no need for a bunded tank a Titan 1225 TT was fitted to complete the new installation. |
| more >> |


